PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed door frames at Stair -4 Facing East.jpg Installed sprinkler branches-heads at the 3rd floor Facing North.jpg Installing Monumental Stairs Facing South.jpg 1st floor VAV boxes Facing West.jpg Curtain Wall Mullions 2.jpg Installing copper piping at the 4th floor Facing West'.jpg Installing copper piping at the 4th floor Facing West.jpg Installing Stair -3 Facing West.jpg Metal furring the Elev. 1,2,3 shear walls at the 4th floor Facing North-East.jpg
Previous pageNext page Curtain Wall Mullions 2
Curtain Wall Mullions 2